Ongoing Project- Wastewater Recycling Plant

The wastewater recycling plant, which is first of its kind in Mongolia, will make water reuse practice possible and reduce the demand for freshwater among Ulaanbaatar’s largest industrial facilities through reuse of the city’s wastewater.

CHPs in Ulaanbaatar use 21 million cubic meters of freshwater (50 000 cubic meter/day which is equal to 23.8 percent of total water use of the city) from groundwater resources a year (mainly for cooling) and 15 million cubic meters or 70 percent of which is used for cooling, cleaning, and ash removing.
Recycled wastewater will reduce the need for freshwater by up to 18.3 million cubic meter/ year (50 000 cubic meter/day), thereby making the freshwater available for household and industrial consumption. This first wastewater recycling plant of Mongolia will help to pave the path for efficient and responsible management of the scarce water resources of Ulaanbaatar.

The Wastewater Recycling Plant, being implemented by MCS Property LLC, will not only promote long-term sustainability in the water sector but also strive to achieve gender equity and social inclusion, supporting lasting economic growth and poverty reduction in the project-affected areas through WRP activities.
Additionally, we are committed to minimizing the environmental impact of construction activities, ensuring that our work contributes positively to both the community and the environment.

Location: Songinokhairkhan District, Ulaanbaatar, Mongolia
Client: MCA – Mongolia
Capacity: 50’000 cubic meter/day
CFA: 9’712.46m2

Categories
All Projects Industrial Our Projects

CHINGGIS KHAAN INTERNATIONAL AIRPORT HANGAR

The hangar is designed to accommodate the simultaneous repair and maintenance of two Boeing 787-9 Dreamliner aircraft.

Location: Tuv province, Sergelen sum, Khushgiin Khundii Airport, Ulaanbaatar, Mongolia.
Client: CAAM – Civil Aviation Authority of Mongolia.
Capacity: 2 Boeing 787-9 aircraft.
Contract Type: Turnkey.
CFA: 14’400м2
Timeframe: 2018-2020

Categories
All Projects Industrial Our Projects

MCS COCA COLA’S NEW PLANT

The MCS Coca-Cola plant has an 11’400m2 area for the production of beverages, water, tea and juice, and a new wastewater treatment and recycling plant. The plant treats 800-1000 tons of wastewater per day.

Location: Bayanzurkh District, Ulaanbaatar, Mongolia.
Client: MCS Coca Cola LLC.
Capacity: Production of 18,000 bottles of beverages per hour.
Contract Type:Construction Main Contractor,
CFA: 11’400 м2
Timeframe: 2008-2009

Categories
All Projects Industrial Our Projects

TIGER GREENFIELD BREWERY FACTORY

М-Си-Эс Тайгер олон улсын стандартад нийцсэн 4600 м2 талбай бүхий шар айрагны үйлдвэрийг 2006-2007 онд нэг жилийн хугацаанд бүтээн байгуулж, жилдээ 300 мянган гектолитр шар айраг исгэх хүчин чадалтай үйлдвэр юм. Энэхүү шар айрагны үйлдвэр нь дэлхийн брэндүүдийг Монголд үйлдвэрлэх зорилготойгоор баригдсан. Шар айрагны үйлдвэр нь бүрэн автоматжуулсан бөгөөд лааз, PET сав, шилэн савыг савлах зориулалттай Германы Krones AG савлах шугамаар тоноглогдсон.

Location: Bayanzurkh District, Ulaanbaatar, Mongolia.
Contract type: Site management local support.
СFA: 4’600m2
Timeframe: 2006-2007

Categories
All Projects Industrial Our Projects

COAL HANDLING PLANT FOUNDATION

With its Coal handling and preparation plant (“CHPP”) in oparation at UHG since 2011, MMC is the first washed coal producer of the country. They CHPP, the first of its kind in Mongolia and set to be one of the largest coking coal processing plants in the world, was designed Sedgman Engineering Technology from Australia, one of the world leaders in the coal processing in material handling technology. The first and second modules of this CHP commenced commercial operations in 2011 and 2012 respectively. MMC’s total name-plate ROM coal proccessing capacity reached and 15Mtpa by the successful commissioning of the plant’s third module in 2013.

Location: Ukhaa Khudag Mining Umnugobi, Mongolia.
Client: Energy Resources LLC.
Contract Type:Construction Main Contractor.
CFA: 8’470 м2
Timeframe: 2010-2011

Categories
All Projects Industrial Our Projects

MINING HEAVY EQUIPMENT WORKSHOP

The mining heavy equipment workshop was designed and constructed to be the most modern and advanced mining workshop facility in Mongolian mining at the time of completion. The facility in-volves the technologically advanced repairing equipment, washing system, oil distribution system, exhausting system and compressed air system.

Location: Ukhaa Khudag Mining Umnugobi, Mongolia.
Client: Energy Resources LLC.
Contract Type:Construction Main Contractor.
CFA: 4’332 м2
Timeframe: 2011-2012